Entered power demand (kW) and cable length (m) by the voltage drop should be used in power plants to exceed 5% copper cable section (mm2) accounts.
Single-phase (220VAC), three-phase (380VAC)
It also makes measurements from the mobile device by using the GPS and automatically transfer the value to the cable cross-sections account screen.
Türkçe, Arapça, İngilizce, Rusça ve Çince desteği vardır.
التركية، العربية، الإنجليزية، الدعم الروسي والصيني
Turkish, Arabic, English, Russian and Chinese support is.
Турецкий, арабский, английский, русский и китайский поддержки.
土耳其语,阿拉伯语,英语,俄罗斯和中国的支持
Latest Version
Varies with deviceRequires Android
Category
Business AppContent Rating
Everyone
Report
Flag as inappropriateLast updated on Aug 2, 2025
Minor bug fixes and improvements. Install or update to the newest version to check it out!