Our website uses necessary cookies to enable basic functions and optional cookies to help us to enhance your user experience. Learn more about our cookie policy by clicking "Learn More".
Accept All Only Necessary Cookies
Oracle Primavera Progress
APK

Oracle Primavera Progress


Oracle America, Inc.

  • 5.2 MB
    Size
  • 1K+
    Downloads
  • Everyone
  • Oct 9, 2021
    Update date

What's New in the Latest Version 21.10.0

Oct 9, 2021

Stay up-to-date with project site updates ... Download the latest version of Oracle Primavera Progress 21.10.0 to enjoy new features and updates immediately!

This app is being retired. Download and use Oracle Primavera Cloud going forward.

Show More

Oracle Primavera Progress FAQ

How much storage space do I need to install Oracle Primavera Progress ?

The download APK file is 5.2 MB, and you’ll need additional free space to install the app and store temporary files, updates, and cache data. If the installation fails, free up some storage and try again.

How long does Oracle Primavera Progress take to download?

Oracle Primavera Progress is 5.2 MB. On a stable 4G, 5G, or Wi-Fi connection, the download may take anywhere from a few seconds to several minutes, depending on your network speed.

Why do I fail to download or install?

Common causes include insufficient storage, an incompatible Android version, an unstable network connection, a corrupted download, or missing installation permissions. See our download and installation troubleshooting guide for step-by-step solutions.

What are the system requirements for Oracle Primavera Progress ?

The latest version of Oracle Primavera Progress requires Android 5.0+ or later. If your device runs an earlier Android version, check whether a compatible older version of the app is available.

What are APK and XAPK files, and how do I install them?

When downloading, you'll find two types of installation files: - APK: A standard Android installation file, ideal for devices that don't require extra data. Download and install directly. - XAPK: Includes the APK and additional resources (e.g., OBB files) for larger apps or games. Use an XAPK installer like APKPure to install. Learn more about installing APK and XAPK files.
Show More

More App Info

  • Languages
    English 70
  • Requires Android
    Android 5.0+ (Lollipop, API 21)
  • Content Rating
    Everyone
  • Architecture
    universal
  • App Permissions
  • Signature
    0c030fddf52427bb8486909ff0b70155da6d497d
  • Developer Verification
    Unknown

Related Tags

Download in Progress

Oracle Primavera Progress Download APK 21.10.0 (5.2 MB)

If the download doesn't start, Click here
Manage Your Downloaded Apps
How to install XAPK / APK file
How to install XAPK / APK file

All Variants of the App

Unlimited
Oracle Primavera Progress APK
21.10.0(66)APK
‪Oct 9, 20215.2 MBAndroid 5.0+
Download
Show More

Also available for other platforms

tracking
Subscribe to APKPure
Be the first to get access to the early release, news, and guides of the best Android games and apps.
No thanks
Sign Up
Success!
You're now subscribed to our newsletter.
Subscribe to APKPure
Be the first to get access to the early release, news, and guides of the best Android games and apps.
No thanks
Sign Up
Subscribed Successfully!
You're now subscribed to APKPure.