Construction Change Order icon

Construction Change Order APK

4 votes, 4.5/5
  • Author:

    Snappii

  • Latest Version:

    1.0.20

  • Publish Date:

    2016-12-12

The description of Construction Change Order

Construction Change Order App was specifically designed for employees working in the construction industry to create quick construction change order requests and provide them to selected supervisors for reviews. The app allows users to instantly fill in specific details including information about labor, equipment, parts, construction sites, date and timestamps, upload PDF documents, take pictures, perform specific calculations etc. The app can be 100% customized by Snappii.

With the help of the Construction Change Order App workers can create change orders on the spots, make a list of supervisors, assign orders to them, track supervisor's feedback and proposed changes in case of rejections. Employees can easily track if their order was accepted or denied and re-make orders on demand. Due to the in-built calculator it is simple to estimate total hours and costs needed to complete a particular project. That definitely saves time and expenses as well as improves accuracy and eliminates paperwork.

Any order will be securely stored on user's device and can be emailed, uploaded to cloud drives or printed out as a PDF form. Moreover, users can upload their own fillable PDF forms to collect specific information as an additional option. The uploaded files will be saved into the library of templates that can be re-used multiple times and shared.

Construction Change Order App will enable users to:

- make construction changes orders on the go
- work offline and online
- save collected orders on a device
- sync completed orders across multiple devices
- track order statuses
- remake orders on demand
- make specific calculations
- share PDF files
- add supervisors
- make reviews and comment on them
- upload custom PDF forms
- custom search by orders

By downloading, you agree to the Terms of Use at https://www.snappii.com/policy

In addition to using free Construction Change Order App version you can get unlimited number of form submissions by subscribing via an optional In-App Purchase and remove all ads by purchasing onetime fee. Subscribe from your device and access these services via mobile app.

In-App Subscription Details:
• Ad Removal is $0.99 US dollars one-time fee
• Monthly Unlimited Form Submission Subscription to get is $4.99 US dollars per month
• Annual Unlimited Form Submission Subscription to get is $49.99 US dollars per year
• Payment will be charged to Account at confirmation of purchase
• No cancellation of the current subscription is allowed during active subscription period
• Account will be charged for renewal automatically

If you are not satisfied with our pre-built mobile form, we can 100% customize it as well as redesign the app to meet your specific business needs.

Show More
Construction Change Order APK Version History
Request Construction Change Order UpdateRequest Update
Construction Change Order 1.0.20 for Android 4.1+ APK Download

Version: 1.0.20 (1020) for Android 4.1+ (Jelly Bean, API 16)

Update on: 2016-12-14

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.20(1020) apk safe verified

APK File SHA1: d6944d9d990e1ac100e68e46e8b8fdcc4ed6b1d7

What's new: • User interface improvements • Bug fixes and performance enhancemen More...

Download APK(10.8 MB)

Construction Change Order 1.0.19 for Android 4.1+ APK Download

Version: 1.0.19 (1019) for Android 4.1+ (Jelly Bean, API 16)

Update on: 2016-12-05

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.19(1019) apk safe verified

APK File SHA1: 0574bf7943c32db5489376b57ada3d1ad096e93e

What's new: • User interface improvements • Bug fixes and performance enhancemen More...

Download APK(10.9 MB)

Construction Change Order 1.0.18 for Android 4.0+ APK Download

Version: 1.0.18 (1018) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2016-11-25

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.18(1018) apk safe verified

APK File SHA1: 097250e80ad43275871c4588c83ecf0e35498506

What's new: • User interface improvements • Bug fixes and performance enhancemen More...

Download APK(10.8 MB)

Construction Change Order 1.0.17 for Android 4.0+ APK Download

Version: 1.0.17 (1017) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2016-07-18

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.17(1017) apk safe verified

APK File SHA1: 0131631ca8aa5ce77e925c2ba38f840512aa34f4

What's new: Minor bugs fixing

Download APK(11.0 MB)

Construction Change Order 1.0.16 for Android 4.0+ APK Download

Version: 1.0.16 (1016) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2016-07-01

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.16(1016) apk safe verified

APK File SHA1: 7fdc5a1478ce83f5b9ff480e4b736ee782751b2b

What's new: Minor bugs fixing

Download APK(10.5 MB)

Construction Change Order 1.0.15 for Android 4.0+ APK Download

Version: 1.0.15 (1015) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2016-05-18

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.15(1015) apk safe verified

APK File SHA1: a96173cc359fbc15c3b31173ebf81963da640361

What's new: Minor bugs fixing

Download APK(10.3 MB)

Construction Change Order 1.0.14 for Android 4.0+ APK Download

Version: 1.0.14 (1014) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2016-04-01

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.14(1014) apk safe verified

APK File SHA1: 5f544ab9f701780d56fa975dcd2af0936ba02414

What's new: New design Improved performanceIntuitive workflow

Download APK(10.3 MB)

Construction Change Order 1.0.13 for Android 4.0+ APK Download

Version: 1.0.13 (1013) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2016-02-22

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.13(1013) apk safe verified

APK File SHA1: f00d48c82af780e4f5bf5e6508a6423db70dc52e

Download APK(11.5 MB)

Construction Change Order 1.0.12 for Android 4.0+ APK Download

Version: 1.0.12 (1012) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2015-12-06

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.12(1012) apk safe verified

APK File SHA1: c9c80cfb264c207112110491ee3d93fc2047eab7

Download APK(11.4 MB)

Construction Change Order 1.0.10 for Android 4.0+ APK Download

Version: 1.0.10 (1010) for Android 4.0+ (Ice Cream Sandwich, API 14)

Update on: 2015-11-03

Signature: b467df8b2264a6c00c758ebe7da236ba0b261735 Construction Change Order 1.0.10(1010) apk safe verified

APK File SHA1: 40a59c2e7b3e38a59ef444a3c3acb74eda67dac8

Download APK(9.4 MB)

Show More
Popular Apps In Last 24 Hours
Download
APKPure App